Numbers on a dashboard are just the starting point—they spark questions more often than they provide answers. The real insight comes when you drill in and explore the records behind those numbers.
To drill down into your report, select the chart and click on the displayed value. This will instantly reveal the underlying records for that selection. For easier analysis, switch to List or Grid view to better visualize the results.
You can also click the link to open the record directly.
Drill downs work on every presentation type except Pivot grid, Single value, and Data table. They also do not work on some kinds of charts. See “Which charts support drill downs?” below.
Which charts support drill downs?
A chart supports drill downs when it meets both of these conditions.
The presentation supports it. Drill downs work on Bars, Columns, Lines, Area, Pie, Donut, Funnel, and Pyramid. They do not work on Pivot grid, Single value, or Data table.
The chart counts or totals records. Drill downs work on # of charts, such as # of Activities and # of Placements, and on Time to Close (average) and Time to Fill (average) charts. They do not work on Activity Ratio charts or Average time in stage charts.
A Single value tile, such as a KPI tile, does not support drill downs even when it counts records. A ratio chart does not support drill downs in any presentation, because a ratio is a calculated measurement and has no related records.
How do I see the records behind a Single value tile?
Add the same measure as a second chart, presented as Bars or Columns, with the same filters, and then select a value in it.
Select Add charts or tables to this page at the bottom of the page. The Add Charts or Tables window opens.
Choose the same measure as your tile, such as # of Placements, and select OK.
Select the gear icon at the top right of the new chart. The Configure Chart window opens on the Settings tab.
Under Presentation, select Bars or Columns.
Select the Filters tab and add the same filters as your tile.
Select OK, and then select a value in the chart.
How do I see the records behind a ratio?
Build a chart for each of the two measures, presented as Bars or Columns, with the same filters as your ratio chart.
Add a # of Activities chart to the page and set Presentation to Bars or Columns.
Select the filter icon at the top right of the chart, and add an Activity Type filter for the first measure.
Add the same date filter that your ratio chart uses.
Select a value in the chart to see the records behind it.
Repeat for the second measure, such as a # of Placements chart.
How do I find the candidates or Opportunities in a stage?
Drill downs are not available on Average time in stage charts, for candidates or for Opportunities. Use a count chart by stage instead, and drill into that.
For Opportunities:
Select Add charts or tables to this page at the bottom of the page. The Add Charts or Tables window opens.
Expand Opportunities, expand # of Opportunities, and select By Stage.
Select OK.
Select the gear icon at the top right of the chart. The Configure Chart window opens on the Settings tab.
Under Presentation, select Bars or Columns, and then select OK.
Select the bar or column for the stage you want. A window lists the Opportunities in that stage, and you can open any of them.
For candidates:
The By Stage page of the Candidates report includes a Candidates by stage funnel. Select a stage in the funnel to see the candidates in it, and then open any of them from the list. You can also use Searching Candidates by Recruiting Stage.
💡 Pro Tip: Use Average time in stage to find which stage is slow, and then use a count chart by stage to see which Opportunities or candidates are stuck in it. Filter both charts the same way so the two match.
Expand the Other group
When a chart has more values than it can show, the extra values are grouped into Other. Select Other to see the records it includes.
Plan availability
Drill-downs are available on Business Plus and higher. On other plans, selecting a chart value shows an upgrade notice instead of the records.
Troubleshooting
Why does nothing happen when I select a value in my chart?
Drill downs do not work on Pivot grid, Single value, or Data table presentations, or on Activity Ratio and Average time in stage charts. Select the gear icon on the chart and check Presentation, and then confirm that you are selecting a value in the chart, such as a point or a bar, and not the title or an axis label.
Why do I see an upgrade notice when I select a value?
Drill downs are available on Business Plus and higher. On other plans, selecting a chart value shows an upgrade notice instead of the records.
Why can I drill into a Time to Fill chart, but not a ratio chart on the same page?
A Time to Fill chart totals the placements, so the records are available. A ratio chart calculates a result from two counts, so there are no related records for the drill down to display.
Key Takeaway
Drill downs work on Bars, Columns, Lines, Area, Pie, Donut, Funnel, and Pyramid charts that count or total records, including Time to Close and Time to Fill. They do not work on Pivot grid, Single value, or Data table presentations, or on ratio charts and Average time in stage charts. Drill downs are available on Business Plus and higher.

